Orwell Bridge in 3D
A 1:1 scale model of the bridge, built in real metres from published dimensions. Drag to orbit, scroll or pinch to zoom, and pick a view below. For the real thing, read the bridge's history and facts or check the live Orwell Bridge status.
Drag to orbit · right-drag or two fingers to pan · scroll or pinch to zoom
Views
The model, in numbers
- Length
- 1,287 m
- Spans
- 18 (17 piers)
- Main span
- 190 m
- Deck width
- 23.98 m
- Girder depth
- 4 m to 12 m
- Clearance
- ≈43 m above high water
- Highest road level
- 49.3 m above sea level
- Gradients
- +4.0% and −3.9%
- Foundations
- 1,142 piles, up to 40 m deep
How it's built. Everything is modelled at its real size in metres. The deck is two separate concrete box girders, one per carriageway, each 11.95 m wide with a 6.5 m box. They are 4 m deep along the approach viaducts and deepen to 12 m over the two main piers, where the main and anchor spans were built out as balanced cantilevers. The road follows surveyed levels, including the right-hand curve at the Wherstead end. The lanes, footways, parapets and safety fences follow the engineering cross-section. The water shows mean high water springs, or low water springs when you choose Low tide.
Estimated. Pier cross-sections (about ±15%), the exact haunch curve, the bearing and plinth height, and the ground beyond the bridge line. These details aren't published, so they're scaled from photographs, drawings and LiDAR. Traffic, the ship and the person are there for scale.
Sources: Orwell Bridge Aerodynamics Study (City, University of London for National Highways) · National Highways · Environment Agency LiDAR · OpenStreetMap · Wikipedia · The Ipswich Society · Freyssinet (bearing replacement, 2011) · ICE Proceedings 1983 (design and construction papers).